YARA GRIDv4.2.0-OS
Operator Console & Simulation Workbench
GRID FREQ50.00 Hz±0.01%
SCADA SYNCONLINE (IEC 61850)
LATENCY8.4 ms
SOLVERDUAL-SIMPLEX MATRIX
CLOCK:02:41 IST(Epoch 93/96)
LIVE DISPATCH ACTIVE
TELEMETRY INGEST ACTIVE/NODE: Saha Metal Works (IN-WB-SAHA-11KV)
VIEWPORT:
OPERATIONAL PARADIGM · DIRECTION CAUTONOMOUS DISPATCH ENGINE V4.8

We don't build dashboards.
We build decisions.

Physical assets, regulatory constraints, and market dynamics orchestrated through a single deterministic execution layer. No passive monitoring. Real-time kilowatt-hour clearing.

Launch Simulation Sandbox
Target FacilityGrid Feeder
Saha Metal Works
Feeder 11kV • Kharagpur Ind.
Exportable SurplusLive Sensor
420.0kWh
500 kWp PV Array
Delivery Window15m Gate
14:30 – 16:00IST
4 Nodal Intervals
Recommended YieldOptimized
₹2,688.00
+₹424.00 vs Discom FIT
Execution PipelineGate 1 Ready
OPERATOR STATUS:Awaiting Sign-off
THE PRODUCT NORTH STAR · ARCHITECTURAL SHIFT

The energy transition doesn't need another graph.
It needs a closed-loop operator.

SaaS platforms sell 14 disparate browser tabs of passive noise. Yara Grid collapses physical physics, volatile spot clearing, and dispatch safety into a single deterministic decision instrument.

14 NOISY CHARTS1 DETERMINISTIC INSTRUMENT
THE STATUS QUO: 14 DISPARATE CHARTSHUMAN IN THE LOOP BOTTLENECK

Passive Telemetry & Spreadsheet Fatigue

Plant engineers watch 14 disconnected dashboards. None of them take action when inverter voltage spikes or when spot prices surge.

Solar Irradiance890 W/m²
Passive Pyranometer
BESS SoC State68.4%
No Auto-Cycle Rule
Feeder Volts11.42 kV
Trip Limit Alarm
Spot Tariff₹6.90
Manual Trading Desk
Induction Load380 kVA
Factory Baseline
Cloud Vectors-14%
Doppler Cloud Radar
Grid Frequency49.98 Hz
SCADA Lag 4.2s
Export Meter312 kWh
Uncoordinated
Import Tariff₹8.40
Peak Slot Active
Inverter THD4.8%
No Action Rule
PF Correction0.91
Manual Setpoint
Weather Delta+12%
Forecast Only
Settlement Lag45 days
Utility Billing
Alarm Queue200/hr
Operator Fatigue
The Engineer's Dilemma:

“What is happening with my energy right now? Zero actionable conclusion. 45 days until the utility settlement bill arrives. Human operator paralyzed by 200 alarms per hour.”

OUTCOME: REVENUE LEAKAGEZERO ACTIONABLE DISPATCH
THE YARA GRID SHIFT: ONE CONTINUOUS DECISION INSTRUMENT14ms DETERMINISTIC

Three Definitive Answers. Zero Dashboard Noise.

Yara Grid replaces the chart zoo with three mathematically proven answers delivered at every 15-minute nodal gate.

1
What should happen next?Commit 420.0 kWh P2P block to 14:30 – 16:00 IST peak window.Lock bilateral execution with Bengal Cold Storage node IN-WB-BRC-09.
2
Why this dispatch route?₹6.40/kWh strike (+₹1.01 above Discom floor) with verified 11kV headroom.BESS degradation preserved. Zero feeder saturation risk (>250 kW thermal margin).
3
What happens if approved?Instant ₹2,634.00 net settlement · 0% factory disruption · SHA-256 seal.Immutable Decision Receipt stamped into ledger with DLMS/COSEM sub-meter verification.
EXECUTION PARADIGMONE-CLICK SIGN-OFF · 100% AUDITABLE
Live Simulation Workbench

Stress-Test the Operator

Simulate live substation grid shocks, thermal constraints, and counterparty dropouts.

Constraint ControlsIEC 61850 V2
672 kW
150 kW (Choked)800 kW (Unrestricted)
420 kWh
100 kWh750 kWh
₹1.40 / cycle
₹0.50 (Aggressive)₹3.50 (Preservation)
Constraint Evaluation Log
Thermal headroom within limits (> 252kW margin) Buyer bilateral contract verified via SEC-P256 Line loss model converged: 0.419% drop
SOLVER STATE: DETERMINISTIC CLEARING
14:09:12 IST
01Timed P2P Block Delivery
Optimal Route
Expected Net Yield:₹2,688.00
Spread: ₹6.40/kWh (+₹1.01 vs FIT)+₹424.00 Alpha
02Export at Discom Baseline (FIT)
Fallback Floor
Default Utility Payout:₹2,264.00
Standard FIT Rate: ₹5.39/kWhZero Alpha (+₹0)
03Buffer to On-Site BESS Racks
Deferred Dispatch
Expected Net of Degradation:₹2,310.00
Evening Peak Arbitrage+₹46.00 Alpha
Audit Stream
15-min Feeder Trajectory
Solar GenLoad Curve
Feasibility Index:98.2%
Transmission Losses:0.419% (Local)
CIP-007 Block Hash:0x838cb98144
Settlement Cycle:Immediate / P2P
12:00:04HEARTBEATOrder book refresh · 11kV bus HM-09-A
12:00:03BID_CROSSEDSpread ₹0.90/kWh · Bengal Retail matched
12:00:02SOLVER_COMMITDual-simplex matrix · epoch 48/96
12:00:01SCADA_SYNCIEC 61850 GOOSE · 130 kW margin verified
RS
Rajib SenChief Electrical Eng. #4412
TOPOLOGICAL EXECUTION

The Operator Decides. The Marketplace Executes.

Industrial engineers do not sit at trading desks clicking order books. The Yara Grid Operator calculates the optimal dispatch route, matches the approved block with vetted industrial buyers, and triggers execution in milliseconds.

MARKET STATUS: MATCHED · 420 kWh @ ₹6.40/kWh
PRODUCER NODEIN-WB-SAHA

Saha Metal Works

Kharagpur Industrial Area, Feeder 11kV
Cleared Dispatch:420.0 kWh
Execution Window:14:30 – 16:00 IST
Base Tariff (FIT):₹5.39 / kWh
Net Inflow Alpha:+₹370.00 Lift
BILATERAL CLEARING BOOKMATCH COMPLETE
₹6.40INR / kWh Cleared Strike
Spread: +₹1.01/kWh vs Discom FIT
BUY 420 @ 6.38MATCH: 420 @ 6.40SELL 420 @ 6.42
11kV Sync BusZero-Packet Drop
OFFTAKER NODEIN-WB-BRC-09

Bengal Retail Collective

Regional Cold Storage & Retail Network
Contract Demand:420.0 kWh (Full Fill)
Discom Peak Avoided:₹7.20 / kWh
Settled Spread Savings:₹0.80 / kWh
Buyer Savings:₹336.00 Saved
ZERO SPECULATION · DURABLE AUDIT

One immutable record connects the decision to the cash result.

Energy investments fail when outcomes cannot be proven. Every dispatch executed by Yara Grid produces a cryptographically sealed Decision Receipt that permanently ties pre-dispatch constraints, human approval timestamps, meter logs, and settled INR proceeds.

AUDIT STATUS: ZERO-VARIANCE VERIFIED
YG
YARA GRID / DECISION RECEIPT
● VERIFIED & SETTLEDREF: YGR-DEC-420-SMW
TARGET FACILITY / NODESaha Metal WorksSMA STP-50000TL Inverter Cluster • Feeder 11kV WBSEDCL
DECISION TYPETimed P2P Block DeliveryWindow: 14:30 – 16:00 IST
OUTCOME SIGNATURE: BASELINE → EXPECTED → SETTLED
01 / Discom BaselineFIT Ref
₹2,264.00Standard Feed-in Tariff
Benchmark Rate: ₹5.39/kWh
02 / Operator ExpectedNodal Alpha
₹2,634.00+₹370.00 projected alpha
16.3% Value Capture Lift
03 / Reconciled Meter100% Sealed
₹2,634.00VARIANCE: ₹0.00 (ZERO-DIFF)
DLMS/COSEM Pulses Reconciled
Authorized KeyRajib Sen (Plant Eng.)
Approval Timestamp14:09:12 IST
Meter Proof Log16:02:44 IST (DLMS Ver.)
Ledger Tx Digest0x4c99a81e9f0...e28b
SHA-256 HASHe838cb9814421bc27993a4bc45942472d41b9d4c2857d3897ca4f4342d812328
Automation you can inspect, bound, and stop.Air-gapped NERC CIP-007 compliance with deterministic tripwire protocols.
IEC 61850 GOOSE
DNP3 Secure V5
DLMS/COSEM HDLC