Skip to main content
GRID SCADA ACTIVEPublic simulation
00:19 ISTL2 OPERATOR CORE
Public system simulationDemo data · No live settlement or physical breaker actuation
Commercial & Industrial Assessment

Run a Shadow Pilot

Evaluate Yara Grid against your site's historical operating data before changing live operations. Start with read-only ingestion, then bounded operator-in-the-loop trials.

420 kWp
₹8.5 Lakhs
₹5.39/kWh
Assumptions Model

• Daily surplus export factor: ~35% of total generation.

• Average P2P bilateral spread: +₹0.95–1.20/kWh vs FIT.

• Zero CAPEX: software layer over existing inverters.

Projected Return on Infrastructure100% operational value
Annual Arbitrage Uplift
₹2.08 L
Solar CAPEX Payback Acceleration
3.5 Yrs
Carbon Offset Credited502.8 Tons CO₂/yr
Estimated Decision Receipts~4471 cryptographic receipts
Shadow Pilot Window14 Days (read-only)
Public simulation