Commercial & Industrial Assessment
Run a Shadow Pilot
Evaluate Yara Grid against your site's historical operating data before changing live operations. Start with read-only ingestion, then bounded operator-in-the-loop trials.
420 kWp
₹8.5 Lakhs
₹5.39/kWh
Assumptions Model
• Daily surplus export factor: ~35% of total generation.
• Average P2P bilateral spread: +₹0.95–1.20/kWh vs FIT.
• Zero CAPEX: software layer over existing inverters.
Projected Return on Infrastructure100% operational value
Annual Arbitrage Uplift
₹2.08 L
Solar CAPEX Payback Acceleration
3.5 Yrs
Carbon Offset Credited502.8 Tons CO₂/yr
Estimated Decision Receipts~4471 cryptographic receipts
Shadow Pilot Window14 Days (read-only)